Concrete Volume
concreteFoundations / slabs. Add 5–10% wastage.
- Concrete needed0m³
- Ready-mix bags (40kg)0bags
// Foundations, paving, decking, muck away
7 calculators available.
Foundations / slabs. Add 5–10% wastage.
Sub-base aggregate at ~2.0 tonnes/m³.
Enter values to calculate →
Topsoil density ~1.6 t/m³.
Enter values to calculate →
Block pavers ~50 per m² (200×100mm).
Standard 6ft (1.83m) panels. One post extra per run.
Std board 2.4m × 144mm with 5mm gap.
Work out tonnage and how many grab lorry loads you need based on the material and lorry size. Densities and payloads use UK industry averages.